Installing Your Whisp Scent Platform
Follow these quick steps to mount, connect, and prepare for first use.
Before You Begin
You’ll need:
- Drill and wall anchors, depending on mounting location.
- ¾″ hole saw or step drill bit
- HVAC foil tape or plumber’s putty
- A screwdriver and level
Things to know:
- The scent distribution line is the large tube which carries the diffused scent to HVAC system
- The scent supply line is the smaller tube which carries essential oil from the bottle into the atomizer
Step 1: Choose Your Mounting Location
- Pick a spot close to ductwork, with an accessible power outlet.
- Keep the device upright and away from moisture or direct sunlight.
Step 2: Mount Securely
- Mount the device close to your HVAC main air supply. You may choose to mount it to a wall or place it on a flat, elevated surface nearby.
- Once the location of the unit has been decided, double-check that the tube length of the larger tubes will reach the main air supply duct with an additional 6 inches to allow for secure insertion into the duct.
Step 3: Drill and Connect
- Drill a hole (approximately 5/8" to 3/4") in the main air supply duct of your HVAC system where the scent distribution line will go
- Insert the scent distribution line and seal around it using foil tape or plumber's putty
- Attach the scent distribution line to your Whisp’s outlet port
- If you have the Whisp 50 or Whisp 150, you will also need to connect the smaller scent supply line from the external essential oil canister(s) to the scent platform.
Step 4: Power On
Connect the DC adapter, turn on the switch, and your Whisp is ready for programming.